Day 23 – Cabinet and side panel install

March 17th, 2018 – Got the first base cabinet installed today, 30 inches wide.  Another one that is 24 inches wide will be going right beside it to completely cover the wheel well.

I also started to install the plywood side paneling.  Before I can put anymore in I need to run electrical wire and put in the receptacle boxes.

side panel cabinet

Author: flyboyhpd

Retired law enforcement now working on converting a school bus into a full time livable motorhome.

2 thoughts on “Day 23 – Cabinet and side panel install”

  1. Following this with much interest. Try to leave an accessible raceway along each side of the bus, front to back, for future wiring, plumbing, and whatever else pops up after you have it finished. You never known what your future demands are on that kind of thing

    Like

    1. Hi Bill, thanks for our input. I’m in no hurry like some others are and I’m taking my time and doing it right the first time. I believe I have thought of everything. But just like a house, if future demands change I’ll adapt. With only 240 sq. ft. it’s not hard to prepare for and over do in the beginning any changes that may come up.

      Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s